After removing the Tiles, Tub and low hanging bulkhead the plumbing controls were moved to the back wall with shut off valves in the crawl space. New framing put in for a flat ceiling. The drain was moved to near the center of the shower pan and mortar to create a drainage slope. There was a water proof liner installed with inside and outside corners that overlap the seal.

tiles were cut and applied to the walls and grouted then sealed with a silicone sealer.

The flooring is a ceramic tile. The toilet was changed and the vanity was changed. The glass was installed at a later date by a glass company.

This was a full Kitchen and laundry room reno